- Industrial Air Conditioners[1]
- Toilet Bowls[1]
- Bathroom Vanities[8]
- Shower Rooms[2]
- Doors[8]
- Windows[4]
- Elevators[1]
- Fireplaces[2]
- Wardrobes[1]
- Basin Faucets[3]
- Bath & Shower Faucets[1]
- Parking Equipment[1]
- Bamboo Flooring[1]
- Tiles[3]
- Engineered Flooring[1]
- Other Home Decor[1]
- Building Glass[3]
- Kitchen Cabinets[1]
- Other Lights & Lighting Products[1]
- Ceiling Lights[3]
- Pipe Fittings[9]
- CCTV Camera[4]
- Steel Sheets[1]
- Artificial Stone[1]
- Stairs[4]
- Wall Switches[2]
- Electrical Plugs & Sockets[2]
- Waterproof Membrane[1]
- Paint & Coating[4]
- Valves[1]
- Contact Person : Ms. Gong Ranbow
- Company Name : China Jiangsu International Foreign Economy Cooperation Co., Ltd.
- Tel : 86-025-86757255
- Fax : 86-025-86757255-801
- Address : Jiangsu,Nanjing,Room 1607, Unit 2, Building 10, Block 2 of West Terra of Wanda Plaza, Nanjing, China
- Country/Region : China
Water Based Rubber Asphalt Waterproof Coating
Specifications:
1.Application Range:
a. Waterproofing of roofing project, washroom and kitchen of industrial and civil buildings;
b. Seepage-resistance and moisture-resistance at basement, pool, refrigerator and ground floor;
c. Can be directly coated onto various pipes and concrete surface to achieve acid and alkali resistant and antisepsis effect.
2.Construction Process:
a. Basement should be smooth, firm, solid, clean, dry, without dust, granular, oil stain or roughness. Internal and external angles are made into circular arch shape.
b. Details treatment: sealing treatment at pipe root; additional waterproof layer should be coated onto details such as internal and external angles and pipe root.
c. Construction of the waterproof layer: according to requirements of the waterproof project, waterproof lay of 1 fiberglass 4 coatings or 2 fiberglass 6 coatings can be made. The construction process is as follows: (1) 1 fiberglass 4 coating process: after first coating, lay out fiberglass grid fabrics after tack free time (about 4h), followed by second coating; after full time (about 24h), do third coating, and do fourth coating after touch dry. The thickness of each coating shall be between 0.3mm~0.5mm. (2) 2 fiberglass 6 coatings process: after first coating, lay out fiberglass grid fabrics after tack free time (about 4h), followed by second coating; after full time (about 24h), do third coating, and do fourth coating after touch dry, do fifth coating after touch dry, and do the sixth coating after touch dry. The thickness of each coating shall be between 0.3mm~0.5mm.
d. Construction of protective layer: perform protective layer or finishing layer construction 1n 48 hours after waterproof construction is completed.
3.Refenced Usage:
Per mm-thick coating membrane, total paint usage is about 3.3kg/m2.
Water Based Rubber Asphalt Waterproof Coating